Sunday, October 17, 2010

First pour part 2

The cement mixer truck had a long boom with a sleeve on the end of it that allowed us to get to almost any part of the foundation without having to move the truck.  We are lucky that our site has good access, also.  At one time this subdivision was used as an RV park so it has small roads and level campsite areas all though it, which makes it really perfect for our purposes.  Our lot has a gravel road going up one side which makes a great driveway.

We were lucky to have beautiful weather for this day.  It wouldn't have been much fun doing this in the rain.  I guess if it rained hard we would have had to postpone.


 Things got kind of tense for a while but there wasn't much bad language!